Saturday, 28 November 2009

Time to level.

With the last lot of rain recently the amount of water in the bottom of the hull was just right to do the final levelling.

A 20t jack was borrowed form Silverton Aggregates They run heavy plant and trucks and kindly loaned me a stubby bottle jack short enough to get under the hull.

A bit of a lift here, bit of packing there, bit of extra support for the back, and an hour and half later it was as level as I could get it.  All the water was in the right place.

No comments:

Post a Comment