Saturday 28 November 2009

Time to level.

With the last lot of rain recently the amount of water in the bottom of the hull was just right to do the final levelling.

A 20t jack was borrowed form Silverton Aggregates They run heavy plant and trucks and kindly loaned me a stubby bottle jack short enough to get under the hull.

A bit of a lift here, bit of packing there, bit of extra support for the back, and an hour and half later it was as level as I could get it.  All the water was in the right place.

No comments:

Post a Comment