Thursday, 16 September 2010

Ballast Update.

My boat has 20 ribs each side of the base.  I have filled the middle 10 each side with slabs.  The 5 each side at the front and back will be left accessible for final adjustment.  

There is now  1860kg of ballast.  Thankfully the lorry delivered it with a Hyab so I had only to lift it down.



No comments:

Post a Comment