I didn't get as much done today as I expected. I took the skeg assy. to an engineering firm for bending. Once its back I'll be able to show you this.
Later on I connected up the calorifier to engine pipes.
Propper insulated calorifier pipe
I filled the engine with 8.5L of oil down the oil hole and 5L antifreeze + 4L of water down the water hole.
Then.................................................
Ignition
I like the location of your instrument panel. LOL
ReplyDeleteHey it worked for what you wanted and you were right there to hear any problems.
Good thinking. :))
If I don't get busy you are going to have yours built before I get mine in the water.
Bill Kelleher
The instrument panel has loads of lead attached to it. it was handy for this job.
ReplyDeleteDon't you think it's a bad idea to have a join from hose to pipe for the calorifier near the inverter/charger?
ReplyDeleteRobbo, I do have reservations, but for now it will do. I will be revisiting this in the future.
ReplyDelete